Featured: Please Sign the Petition: Amend the Ancient Monuments Act to ban all building on Scheduled Sites

Please Sign the Petition: Amend the Ancient Monuments Act to ban all building on Scheduled Sites

Prehistoric Cumbria

Prehistoric Cumbria

Login

Register here - as a registered user you get more features and fewer ads.

Who's Online

There are currently, 581 guests and 0 members online.

Sponsors

Achievable Stonehenge Stone Circle Wiltshire

Submitted by Thorgrim on Sunday, 12 February 2006  Page Views: 6303

Neolithic and Bronze Age

<< Feature Articles >>

Country: England County: Wiltshire Type: Stone Circle

Internal Links:

submitted by : (Vote or comment on this photo)
Following a Public Inquiry in 2004 into proposals for improving the A303 past Stonehenge, it was recommended that a 2.1 km long bored tunnel should be built to remove the effects of the road and traffic from Britain’s most famous prehistoric location which is now a World Heritage Site. However, the costs for this project have risen significantly and Government Ministers are calling for an alternative lower cost scheme. A public consultation exercise has been launched in order to identify an acceptable lower cost scheme. Many of us feel that any delays in improving access to Stonehenge, its landscape and environment should not be delayed by Government indecision and perceived prohibitive costs of a tunnel for the A303. In January, the Department of Transport launched a Public Consultation to review the scheme and replies are required before the 24th April 2006. As a response, we believe that the following proposal has merit. We publish it here for your information and comment.

A303 Stonehenge Improvement – an alternative lower cost scheme.

Scheme Review – Public Consultation

This considered response meets the requirements of a reduced costs, phased scheme that will meet the expressed aims of the Project.

Summary of this Proposal.
The prohibitive cost of tunnelling or re-routing the A303 should not be allowed to delay the closure of the A344, existing car park and facilities. The restoration of the wider Stonehenge landscape is seen as the priority for Phase 1. This is a viable and attractive low cost option.

Aims of the Project

“To restore the dignity and isolation of Britain’s greatest prehistoric monument and enable people to enjoy and appreciate it fully”. The keywords here are “dignity” and “isolation”.

Phase 1
A “Removing the visual impact and noise of roads and traffic from the vicinity of the Stones”
1 Close and remove all traces of the A344 together with its hedges and fences. Turf the area with appropriate wildflower grass mixtures.
2 Remove all traces of the car parks and visitors centre. Retain visual evidence of postmarks, re-turf as above.
3 Remove all security fencing from the proximity of Stonehenge and secure the site at the boundaries of the present National Trust land. See D1 below for access.
4 Defer A303 improvements and carry on independently with all other improvements until Phase 1 is complete.

B “Reuniting Stonehenge and its surrounding monuments in their natural chalk downland setting”
1 Abandon the Northern Route as a viable option. There is too much archaeology to the north and easy access to the Cursus, Woodhenge and Durrington Walls is seen as a vital and integral part of the Stonehenge experience.
2 Perimeter fencing should be secure but unobtrusive. Wherever possible, it should be hidden by earth banks or in sunken ditches on the ha-ha principle.

C “Creating the conditions for improved biodiversity with flowers, butterflies, birds and insects flourishing”
1 Maximise the extent of the traffic free area to encourage undisturbed wildlife.
2 Manage natural chalk grassland and ban all chemical spraying. Be aware of drift from adjacent farms.
3 Ban military aircraft from over flying and control private aircraft that currently “buzz” Stonehenge for aerial views. Set height limit.

D “Providing improved access, enabling people to roam freely and at no cost throughout the World Heritage Site.”
1 Pedestrian access to the Stonehenge landscape should be free of charge as stated in your aims. However, free access should only be from controlled distant points on the perimeter. Pedestrians would pay to park their cars outside the access points. Car parking should be at Countess East, but also to the north and west near Durrington and Shrewton.
2 Free and unlimited access to the Stones is seen as an impractical ideal. We remember the severe erosion around the Stones in the 1970’s and no natural grass can resist such heavy foot traffic as is anticipated.
3 Run ample low impact shuttle buses over variable strengthened trackways from distant access points to the current pedestrian tunnel.
4 Taking operations at the Irish sites of Newgrange and Knowth as examples of good practise, visitors could arrive at Stonehenge from one direction and leave by another. This would give non-pedestrians good, fairly long distance views of the surrounding monuments from different directions. This would also prevent buses leaving the Stones from blocking the view of those arriving. Abandon the idea of a land train as this would be unsightly, permanent and intrusive.
5 Set the cost of the shuttle bus at £10 (to include car parking) with reductions for children and free for the disabled. This will enable disabled visitors to reach the Stones, while others may wish to hop on and off to walk part of the way.
6 Live or recorded guide commentaries would remove the need for an over elaborate Visitor Centre – see below.

E “Building a new world-class visitor centre outside the World Heritage Site at Countess East
1 The estimated cost of £60 million is excessive but will inevitably be exceeded. That amount of money could better be spent elsewhere in the heritage remit.
2 Over exposure to amenity interpretation, visual aids, reconstructions etc can be counter productive and can diminish the visitors’ experience when actually arriving at the monument itself. Too much hype may lead to disappointment. Stonehenge should remain true to itself and can speak for itself as an enigmatic mystery. Too much “explanation” will diminish the sense of awe and mystery that is its key attraction.
3 Provide a limited visitors centre at the shuttle bus departure point. This to provide restrained interpretation with toilet facilities and a point of sales outlet. With reference to facilities provided at equivalent monuments elsewhere, a highly effective interpretation display could be provided at a fraction of the mooted £60 million. The Bru na Boinne Centre provides a good example with reasonable food and interesting displays while visitors await their shuttle bus.

4 A limited visitors’ centre and shuttle bus departure point could be located at Countess East or possibly to the north or west of the World Heritage Site near Durrington or Shrewton.

5 At Stonehenge itself, the metalled pedestrian path that cuts across the site must be removed and could be substituted by a removable pedestrian trackway. A toilet block and custodian office could usefully be located out of site in the present pedestrian tunnel.

Phase 2
As outlined in our summary – we believe that expensive and time costly improvements to the A303 should not prevent an early start to improving the Stonehenge landscape. However, a final solution is required in the longer term and we see that being Phase 2. Our comments on each option follow:

1 Published Scheme. A long bored tunnel would be our ideal solution.
2 Northern Route. We are opposed to this as it is far to disruptive to the archaeology, too close to the Cursus and cuts off Woodhenge and Durrington Walls from the Stonehenge landscape.
3 Southern Route. This is our preferred option if the ideal solution is not to be adopted. The new route should be outside of the southern extent of the National Trust land. Even so, the new road should be hidden by earth banking to hide its visual impact and to reduce noise. A better option would be to sink the road in a cutting.
4 Cut and Cover Tunnel. This is unsupportable. Disruption and landscape scarring will be extensive and intolerable during its prolonged excavation and construction. More so if the road is to be a dual carriageway. Traffic vibration and fumes would remain hazardous to the Stones and the environment.
5 Partial Solution. Our proposal offers a variation of the Partial Solution as Phase 1. This is not a permanent solution as the A303 must ultimately be re-routed.


This proposal will be sent to:
The Stonehenge Project
Highways Agency Zone 2/26-H
Temple Quay House
2 The Square, Temple Quay
BRISTOL, BS1 6HA

Please add your thoughts on this site

Children Of The Stones DVD

Children Of The Stones DVD

Sponsors

More Feature Articles

See all Feature Articles →

"Achievable Stonehenge" | Login/Create an Account | 12 News and Comments
  
Go back to top of page    Comments are owned by the poster. We aren't responsible for their content.
Re: Achievable Stonehenge by Anonymous on Tuesday, 28 February 2006
Occasionally I drive from London to Devon; by Wiltshire I'm bored and tired. But then, Stonehenge appears - ancient, beautiful. I love pointing it out to my children, trying to install in them the awe it makes me feel. I would be so sorry if this road were buried.
[ Reply to This ]

Re: Achievable Stonehenge by MickM on Monday, 13 February 2006
(User Info | Send a Message)
The truth is that none of the government proposals are acceptable, have a look at the CBA view. Mike Heyworth has just released this on Britarch;

CBA



  • [ Reply to This ]

    Re: Achievable Stonehenge by MickM on Monday, 13 February 2006
    (User Info | Send a Message)
    I believe that unless the road is routed much further away than the proposed routes then the deep bored tunnel is the only acceptable solution & the longer the tunnel, the better. All other options will impact on the World Heritage Site to some degree and should be opposed. These proposals have the hallmark of an insurance salesman trying to get a foot in the door, don't let him in! If the political will is not there at present for a more radical solution, then the best option is to do nothing until it is. All damage from an unsatisfactory project will permanently scar the site for future generations.
    [ Reply to This ]
      Re: Achievable Stonehenge by Thorgrim on Monday, 13 February 2006
      (User Info | Send a Message)
      We should not think that the tunnel has no adverse effects. Concern has been expressed that there will be "intrusive tunnel approaches in the high quality landscape at Longbarrow crossroads and King Barrow ridge". Furthermore, what about vibration from traffic hurtling through four lanes of subterranean dual carriageway? The traffic may be hidden, but it will still be just as close to Stonehenge as it is today. If the landscape is "sacred", I just don't like the idea of tunneling under it and running traffic through it. Better by, far to re-route the A303 south and take it much further away from Stonehenge altogether.
      [ Reply to This ]
      Re: Achievable Stonehenge by Anonymous on Monday, 13 February 2006
      Can I just point out that the main point of this proposal is to concentrate on what could be done in the short term, irrespective of the main controversy - which it has got glued to, for no good reason.

      Nicola's vision of walking across the downland etc etc is achievable, cheaply and soon, if only we all push for it (with the exception of the A303 of course, which may yet take decades to sort out).

      "Achievable Stonehenge" was hatched across several forums and newsgroups, but it can belong to the whole megalithic community if they'll stick together, try not to argue about the minor details or get sidetracked down the interminable A303 argument.

      Nigel
      [ Reply to This ]
        Re: Achievable Stonehenge by Thorgrim on Monday, 13 February 2006
        (User Info | Send a Message)
        Much as I share Nicola's wish, with thousands of people per day wanting access to Stonehenge - its never going to be like that.
        [ Reply to This ]
        Re: Achievable Stonehenge by nicoladidsbury on Wednesday, 15 February 2006
        (User Info | Send a Message)
        I did say I was a dreamer, I know I'm never likely to enjoy the kind of access I want, so I'll stay happily in love with Long Meg. Now that is a perfect place.
        [ Reply to This ]

    Re: Achievable Stonehenge by Anonymous on Sunday, 12 February 2006
    Ah! the 1960's ;)
    [ Reply to This ]

    Re: Achievable Stonehenge by nicoladidsbury on Sunday, 12 February 2006
    (User Info | Send a Message)
    Andy's ideas on the restoration of Stonehenge make a lot of sense to me. I visited three years ago, with my two youngest children. I felt totally alienated from the stones. It was almost an horrible experience, and very expensive. I much prefer our less famous stone circles, because of the peace you can find at them.
    My dream of Stonehenge would be to be able to walk across the moor towards the stones, listening to skylarks sing, and butterflies lift from the wild chalk land flowers. I want to be awestruck as I approach the stones, truly feeling their impact on my reality. I want to sit in peace and appreciate this place, to try an imagine how my ancestors may have felt. I want to be able to visit at sunrise and I want to be able to stay until sunset, on any day of the year.
    Andy's interpretation of the options give me a glimpse of a reality I like.
    I am such a dreamer and a bit of an optimist! :)
    [ Reply to This ]
      Re: Achievable Stonehenge by Thorgrim on Monday, 13 February 2006
      (User Info | Send a Message)
      Perhaps I should just point out that this proposal was co-written by Nigel Swift, Littlestone and myself and published simultaneously on the Portal, TMA, Heritage Action and the Stones List. This shows how effective we can be when we work together for the common good.
      [ Reply to This ]

    Re: Achievable Stonehenge by JCAntunes on Sunday, 12 February 2006
    (User Info | Send a Message)
    Can someone make a sketch of the idea?
    [ Reply to This ]

    Re: Achievable Stonehenge by andyworthington on Sunday, 12 February 2006
    (User Info | Send a Message)
    Hi all,
    I think this is a very good starting point for discussions, so here are my first thoughts about it:
    A 1-4. Excellent.
    B 1. Yes, I agree that the Northern Route is unacceptable, but perhaps, instead of mentioning any of the 5 proposals in the ‘new’ road plans at this point, we should state from the beginning that we’re opposed to all of them, and that only the long bored tunnel would be acceptable. I realize that this is what you’ve done in your proposal at ‘Phase 2’, but still think it would be better to state upfront that we’re presenting this alternative scheme because of the problems with the 5 current proposals.
    B 2. I can’t agree with this. No more unnecessary digging, please. If fencing is moved to the edge of the NT land (as proposed in A3), this will be enough.
    C 1-2. Yes.
    C 3. Don’t even propose it. Until we elect a pacifist PM, the warmongers’ demands will supersede all others.
    D 1. Yes – though for Shrewton read Airman’s Cross.
    D 2-6. Not sure about these....

    Read the rest of this post...
    [ Reply to This ]

    Your Name: Anonymous [ Register Now ]
    Subject:


    Add your comment or contribution to this page. Spam or offensive posts are deleted immediately, don't even bother

    <<< What is five plus one as a number? (Please type the answer to this question in the little box on the left)
    You can also embed videos and other things. For Youtube please copy and paste the 'embed code'.
    For Google Street View please include Street View in the text.
    Create a web link like this: <a href="https://www.megalithic.co.uk">This is a link</a>  

    Allowed HTML is:
    <p> <b> <i> <a> <img> <em> <br> <strong> <blockquote> <tt> <li> <ol> <ul> <object> <param> <embed> <iframe>

    We would like to know more about this location. Please feel free to add a brief description and any relevant information in your own language.
    Wir möchten mehr über diese Stätte erfahren. Bitte zögern Sie nicht, eine kurze Beschreibung und relevante Informationen in Deutsch hinzuzufügen.
    Nous aimerions en savoir encore un peu sur les lieux. S'il vous plaît n'hesitez pas à ajouter une courte description et tous les renseignements pertinents dans votre propre langue.
    Quisieramos informarnos un poco más de las lugares. No dude en añadir una breve descripción y otros datos relevantes en su propio idioma.