The footpath leading up to the fort at dun deardail is currently undergoing reconstruction .by local specialists PATHOLOGY, But is still open .will have laid a good solid path a metre wide . the lower section of path will eventually be rebuilt for wood extraction ,so will not receive the same level of resurfacing . The work will extend from the style up as far as the boardwalk below the fort..The plastic bags are actually geotextile rolled out over the peat bog in order to float the path.this will all be replaced with superior materials to reduce damage by water erosion. yours Dave ,PATHOLOGY.
Something is not right. This message is just to keep things from messing up down the road